Industrial Engineering Dept.

King Saud University – College of Engineering – Industrial Engineering Dept.
El-Sherbeeny, PhD Feb. 13, 2021 IE 462 (01,02,03) – Spring 2021 PROJECT Page – 1
IE-462
Section 1, CRN: 35760/61/62
Section 2, CRN: 35771/72/73
Section 3, CRN: 48769/70/71
Second Semester 1442H (Spring-2021) – 2(2,1,1)
“INDUSTRIAL INFORMATION SYSTEMS”
Saturday, February 13, 2021 (01/07/1442H)
Course Project [20 Points]
[CLO1: 25%, CLO2: 25%, CLO3: 50%]
Assessment and Redesign of Industrial Information System in Saudi
Workplace
You are required to contact and review a Saudi workplace or system of your
choosing, then analyze, model, and redesign their industrial information system.
The following rules apply:
a) You are required to work in a team consisting of 4‐5 students. No
exceptions!
b) The workplace can include either an entire institution, or –preferably– a
system within an institution (e.g. inventory or sales department for a large
company); and can include any private or public sector company or
institution.
c) Academic honesty rules seriously apply! You are not permitted to use a
project from a previous semester or obtained from any other external
source. KSU and COE Plagiarism rules will be very strictly enforced. Any
assistance received during the project must be explicitly justified.
d) You must attach detailed photos to support your work, showing all parts
of the designed IIS, sample employees at work, and the design team, etc.
You must also properly cite all your utilized references (e.g. company
work regulations and policies).
e) You can earn more credit depending on the quality of your work
(especially the design and redesign of the IIS).
f) The report must include the following sections:
 Background regarding your selected workplace
 Justification for why you chose this particular workplace/system
 List and description of information and functions involved in the IIS,
and how they are related (i.e. the company’s business model)
 Detailed steps of what was done during the project, including work
King Saud University – College of Engineering – Industrial Engineering Dept.
El-Sherbeeny, PhD Feb. 13, 2021 IE 462 (01,02,03) – Spring 2021 PROJECT Page – 2
breakdown structure (WBS) and Gantt chart, etc.
 IIS models, including detailed forms and explanation, before and after
the redesign phase:
o Process modeling: detailed IDEF0 model, DFD model (top level
down to elemental/primitive levels)
o Data modeling: E‐R diagram (with attributes)
 MS Access database file to simulate how your IIS works, including:
o Sample database tables
o Sample queries, forms, and reports
 References
 Appendix 1: Who did what
 Appendix 2: Photo section (see point d above)
 Note, all presented work must be neatly typed (no handwritten work
will be accepted). Note, besides content and quality, you will also be
graded on your spelling, grammar, formatting, neatness, etc.
g) Your group will be required –collectively– to perform a 6 to 7‐minute
presentation (you will not be allowed to exceed the time limit).
 You will present a summary of your project, including a slide that
states your references and “who did what,” as well as sample
photos (see point d above).
 You must also show all sections elaborated in your report,
including sample queries and forms from your database
 Note, besides the quality of the content of your work, you will
receive a grade for your overall presentation and speech skills, as
well as your PowerPoint slides. All group members must participate
in this activity.
h) You must submit the following by 2 PM on the day of your scheduled
presentation (no late work will be accepted):
 Report showing all steps and details of the complete work
accomplished in this project (.docx format)
 Presentation (.pptx format)
 All references you have used, forms, reports, and any other
material that add value and authenticity to your work. Remember,
you will be monitored for plagiarism.
 MS Access database file (with sample queries) and all modeling‐
related files and figures.
 Place all work in one folder then submit your work by email, in one
King Saud University – College of Engineering – Industrial Engineering Dept.
El-Sherbeeny, PhD Feb. 13, 2021 IE 462 (01,02,03) – Spring 2021 PROJECT Page – 3
zipped file (e.g. “Project_G04.zip”) to aelsherbeeny@ksu.edu.sa.
Let me know if your work exceeds 25 MB as the KSU server does
not allow attachments exceeding 25 MB.
 Make sure to include your group number on all submitted work
(cover page of report / first slide of presentation).
i) The scheduled presentation date is: Thursday, Apr. 15th, 2021
(03/09/1442H).
 The presentations will be held via Zoom, at the usual address
(https://zoom.us/j/2557992359). Groups should be prepared to
start and be waiting in the waiting room 5 minutes prior to the
designated starting time. As soon as the prior group has completed
your group will be allowed to enter.
 A total of 15 minutes are allotted to each group, distributed as
follows:
 6 to 7‐minute presentation (as mentioned above)
 4 to 5‐minute Q/A session
 2 to 3‐minute transition to the new group
I wish you the very best with this project, and hope you can both learn and enjoy
working on it.
King Saud University – College of Engineering – Industrial Engineering Dept.
El-Sherbeeny, PhD Feb. 13, 2021 IE 462 (01,02,03) – Spring 2021 PROJECT Page – 4
List of Previous Projects
Note, you are allowed to choose any Saudi workplace so long as your selected
information system has not been chosen in a previous project.
# Workplace System
1 Alayady Alalmiah (spare parts) Inventory
2 Al‐Babtain Production
3 AlHabib Hospital Appointment
4 Aljaz Factory Ordering
5 Alkaabs Inventory
6 Al‐Khorayef Inventory
7 Alshablan Medical Center Appointment
8 Auntie Anne’s Pretzels Ordering
9 Bamasaq (spare parts) Customer‐ordering
10 Beez (Logistic Company) Inventory
11 Boodi’s Burger Ordering
12 Ceramic Home Sales
13 Dodge Maintenance
14 Elixir Bunn Ordering
15 Estechtab Factory ‐ Plastics and Molds Production
16 EX9 (coffee shop) Billing
17 Gansu Payroll
18 Kawader Training Payroll
19 King Fahad Public Library Borrowing
20 King Saud University Deanship Admission / Registration
21 King Saud University Library Borrowing
22 King Saudi University Medical City Purchasing
23 Laan Care Ordering
24 Maison Global Inventory
25 Mustach Burger Ordering and Cooking
26 NAQEL Shipping
King Saud University – College of Engineering – Industrial Engineering Dept.
El-Sherbeeny, PhD Feb. 13, 2021 IE 462 (01,02,03) – Spring 2021 PROJECT Page – 5
27 Obeikan Folding Carton (OFC) Production
28 Real Burger Ordering
29 Riyadh Airport Station COVID‐19 Test Appointment System
30 Sahar Vital Production
31 SMASCO Customer‐ordering
32 Tamimi Markets Ordering
33 Tanatel Furniture Factory Inventory
34 Tathmeen Valuation
35 Texas Chicken Customer‐ordering
36 Top 100 Distribution
37 Varietal café Ordering
38 Which Wich Ordering
Order Now

Calculate a fair price for your paper

Such a cheap price for your free time and healthy sleep

1650 words
-
-
Place an order within a couple of minutes.
Get guaranteed assistance and 100% confidentiality.
Total price: $78
WeCreativez WhatsApp Support
Our customer support team is here to answer your questions. Ask us anything!
👋 Hi, how can I help?